Types of Work Involved

  • BrickworkBrickwork
  • Carpentry & JoineryCarpentry & Joinery
  • FlooringFlooring
  • Groundwork & Civil EngineeringGroundwork & Civil Engineering
  • Painting & DecoratingPainting & Decorating
  • RoofingRoofing
  • Sanitaryware Install & PlumbingSanitaryware Install & Plumbing
  • Structural EngineeringStructural Engineering

The Project

This was a project incorporating internal and external works to be carried out at a school for Slough Borough Council.

Much of the structural work was completed during the school holidays, however, the fitting out of the changing room had to be done whilst the school was in full use during term time.

The biggest part of the work was creating a structure in between 4 existing buildings within the school compound so that a roof could be installed to create a changing room. In addition to this, the three toilet areas were refurbished, decorated and new floors were laid in other areas.

We programmed the work so that the changing room area was structurally sound and ready for fitting out. The toilet areas were completed and ready for use during school time and all works completed in school time was coordinated to create minimum disruption to the school.

    Request a call back


    For an initial chat and a no-obligation quote, contact us on 0118 214 3295