Types of Work Involved
- Brickwork
- Electrical
- Fencing
- Flooring
- Groundwork & Civil Engineering
- Painting & Decorating
- Refurb
- Roofing
The Project
North Maidenhead cricket club required internal and external works to the club house as well as a new electronic scoreboard with housing.
The team excavated the over site and formed a floating reinforced footing. Brickwork was installed up to the timber pitched tiled roof, before new UPVC guttering and fascia’s were fitted. The new electronic score board was installed and wired in with the electrics feeding to the score board housing. A new high level boundary net was installed.
The main changing room was refurbished, firstly with new carpet tiles laid to main changing room. A picket fence was installed in front of the club house. Then damaged slabs were replaced in front of the club house with a brushed finish concrete slab.
Decorating to the external wall fascia and soffits revamped the façade. The down pipes and guttering were replaced as well as the cladding below the window which was replaced and painted. The overall effect brough life back to the clubhouse.